Most crane failures are not the result of a crane’s failure to perform as designed. Most are due to mishaps made by people well before the load is hoisted. Misreading a load chart is fairly common and happens on an otherwise unremarkable day as compared to a difficult lift day. Below are a few mistakes to look out for, and how to correct them.

Treating the Chart as a Single Number

It is understandable to look at the largest figure on the side of a crane and assume that is the crane’s capacity. That figure usually represents the capacity at the crane’s shortest radius with the boom fully retracted. At longer radii, that figure can drop dramatically. A fifty tonne crane may only be able to lift a few tonnes at full boom extension.

To correct this, you must work from the radius as opposed to the rating. Measure from the pivot point to where the load needs to be placed, and then read horizontally from that point.

Using the Wrong Configuration

Charts are done for a specific configuration. All changes to the crane including boom sections, jibs, and counterweights alter the chart. A common mistake is to use a chart for a fully extended outrigger set when, in fact, the outriggers were only partially extended due to the condition of the ground. In that case, the chart to be used is for the partially extended outriggers.

For either of these cases, the correct lift plan must be developed to account for the more restrictive set-up.

Prior to any lift, the appointed person must verify that the chart in the cab matches the machine and configuration. This check is repeated throughout the day if anything changes.

A briefing before the first lift accompanied by a lift plan, helps align the team and gives the crew on site the authority to refuse a change in plan.

Doing it Right Every Time

Lifting is mostly repetition. Get the crew to read the chart, confirm the configuration, add up the rigging, check the ground conditions, and brief the team. These habits close off the most frequent errors.

Under the LOLER, lifts must be supervised and carried out by a competent person. When using a mobile crane for a day, or a tower crane over a longer term contract, the load chart is the basis for that crane’s lifting plan.

If you are unsure about a particular lift, contact your crane supplier. It’s a good way to get information to help you do your job, and it will be better for all concerned if these talks happen early.